Preparation drawing

Drawing that describes how the preparation of the shelter is to be carried out.

Catch device for radiator

A certified metal bracket according to SR 15.

Catch device for fixture

A certified metal bracket according to SR 15.

Mountable columns

Some shelters need mountable columns to withstand calculated fall loads from the building the shelter is located in. These columns must be installed when preparing the shelter.

Shelter molding

Type-approved shelter compound for sealing cracks during preparation.

Concrete plugs

Concrete plug for plugging wall sleeve with protective plate.

Water container

Food-approved water containers according to SR 15.

Bucket toilet

Bucket toilet set according to SR 15.

TC location

Toilet space for Bucket toilet.

Tool kit

Certified and sealed Tool kit for setting up shelters.